A shower remodel without the six week bathroom.

A shower remodel without the six week bathroom.

The look of natural stone, without the tile, the grout, or the weeks of your bathroom sitting open as a job site.

Why this takes days and not weeks

A tile shower gets built in layers, and every layer has to cure before the next one goes on. That is where the weeks come from. Panels arrive cut to your measurements, so the time goes into the waterproofing behind them instead of waiting on mortar.

What it costs

You get the look of a stone slab for a fraction of what slab costs, because the panel is engineered to look like stone rather than quarried and cut.

How it holds up

The surface does not absorb water, so there is nothing for mold and mildew to feed on and nothing to reseal every year.

How long it takes

Panels mount straight to the backer, so most showers are finished in a day or two instead of the weeks a tile build needs.

What you choose

Color, pattern, base size, trim, glass and accessories. Nothing is a package you have to take whole.

See it before you build it.

Put real finishes on a bathroom photo, change every detail, and save the plan to bring to your consultation.

Design your remodel in three steps

01

See it

Put real finishes on a bathroom in the Design Studio.

02

Make it yours

Pick the layout, fixtures, glass, niche and accessories.

03

Save and send it

Save the design and ask for a free consultation in one tap.

Remodel FAQ

Yes. Small or large, the panels are cut to your measurements, including custom bases up to 60" x 96" with the drain wherever it already sits.

There are more than twenty colors plus tile patterns, with trim to match. Most people land somewhere between a warm travertine and a cool marble, but the range runs wider than that.

Mild soap diluted in water, rinse, wipe with a soft cloth. Skip abrasive cleaners and scouring pads, which will dull any surface including this one.

Most showers are finished in a day or two because the panels mount straight to the backer. If we open the wall and find rot or plumbing that has to move, we stop and tell you what that costs before we touch it.

Build a better bathroom

Design your shower now and hand a finished plan to your consultant. No deposit, no obligation.